University of Twente Student Theses
Increasing Traffic Safety in the Factory of Scania Zwolle
Borggreve, P.J.P. (2024) Increasing Traffic Safety in the Factory of Scania Zwolle.
PDF
3MB |
Abstract: | This thesis is performed at Scania Zwolle. In Zwolle, Scania assembles most of the trucks they are making. The company has two main assembly lines in their factory, the Pollux and the Castor line, at which all the trucks are assembled. All the materials are brought to the two production lines with transporters like trains and forklifts from outside the factory. However, this process results in quite some problems regarding traffic safety in the factory. All kinds of traffic flow across each other, resulting in unsafe situations in the factory |
Item Type: | Essay (Master) |
Clients: | Scania Production Zwolle |
Faculty: | BMS: Behavioural, Management and Social Sciences |
Subject: | 02 science and culture in general |
Programme: | Industrial Engineering and Management MSc (60029) |
Link to this item: | https://purl.utwente.nl/essays/100657 |
Export this item as: | BibTeX EndNote HTML Citation Reference Manager |
Repository Staff Only: item control page