University of Twente Student Theses

Login

Cost Overruns in Bouwteam Infrastructure Projects : Causes and Control Measures

Broek, R.P. ten (2025) Cost Overruns in Bouwteam Infrastructure Projects : Causes and Control Measures.

[img] PDF
6MB
Abstract:This thesis aims to quantify trends in and define mitigation strategies for cost overruns in bouwteam infrastructure projects. In bouwteams, client and contractor create a design collaboratively by working together early in the project. Previous research identified many qualitative beneifts for this way of working, as well as some cost overruns. This research aims to quantify the causes of these cost overruns. Additionally, it formulates mitigation strategies.
Item Type:Essay (Bachelor)
Faculty:BMS: Behavioural, Management and Social Sciences
Subject:56 civil engineering, 85 business administration, organizational science
Programme:Industrial Engineering and Management BSc (56994)
Link to this item:https://purl.utwente.nl/essays/106341
Export this item as:BibTeX
EndNote
HTML Citation
Reference Manager

 

Repository Staff Only: item control page