Spatial Resource Costrained Project Scheduling : the allocation and sequencing of activity groups tospatial resources
Kok, A.L. (2006) Spatial Resource Costrained Project Scheduling : the allocation and sequencing of activity groups tospatial resources.
PDF
338kB |
Abstract: | In this paper, we present a new topic in connection with project scheduling. Since a limited work space can form a restriction to project scheduling problems, an ecient usage of these work spaces (or so-called spatial resources) is required to produce good project schedules. The requirement for the resource units of these spatial resources is in an adjacent manner (we cannot place a product under construction in separate parts of the work space). A spatial resource unit is not required by a single activity, but by a so-called activity group. |
Item Type: | Essay (Master) |
Faculty: | EEMCS: Electrical Engineering, Mathematics and Computer Science |
Subject: | 31 mathematics |
Programme: | Applied Mathematics MSc (60348) |
Link to this item: | https://purl.utwente.nl/essays/56927 |
Export this item as: | BibTeX EndNote HTML Citation Reference Manager |
Repository Staff Only: item control page