University of Twente Student Theses

Login

Spatial Resource Costrained Project Scheduling : the allocation and sequencing of activity groups tospatial resources

Kok, A.L. (2006) Spatial Resource Costrained Project Scheduling : the allocation and sequencing of activity groups tospatial resources.

[img] PDF
338kB
Abstract:In this paper, we present a new topic in connection with project scheduling. Since a limited work space can form a restriction to project scheduling problems, an ecient usage of these work spaces (or so-called spatial resources) is required to produce good project schedules. The requirement for the resource units of these spatial resources is in an adjacent manner (we cannot place a product under construction in separate parts of the work space). A spatial resource unit is not required by a single activity, but by a so-called activity group.
Item Type:Essay (Master)
Faculty:EEMCS: Electrical Engineering, Mathematics and Computer Science
Subject:31 mathematics
Programme:Applied Mathematics MSc (60348)
Link to this item:https://purl.utwente.nl/essays/56927
Export this item as:BibTeX
EndNote
HTML Citation
Reference Manager

 

Repository Staff Only: item control page