Reducing Takt Time at VMI by Improving the Flow of Supplies

Author(s): Gerrits, L.J.H. (2014)

Abstract:
How to significantly reduce the takt time of a drum and optimise the logistics flow by improving the flow of supplies at the internal warehouse and assembly hall?