Facility layout redesign at Siemens Hengelo: an integrated graph theoretic, manual and analytical approach
Meijer, E. (2014)
This report is the result of a research at Siemens to advice on a facility layout redesign of the
Hengelo site. Siemens Hengelo requires a new facility layout as the physical availability in
buildings changes due to a construction project of the municipality of Hengelo. Moreover,
business developments at Siemens Hengelo require changes and additions to current activities.
These have to be incorporated into the new layout design. This research is executed for both
business units located on the Hengelo site, namely: Packaged Compression Trains (PCT) and
Services Oil and Gas (SO).
Meijer_MA_MB.pdf