University of Twente Student Theses

Login

Optimizing the material flow at Bosch : supplying the Deventer plant with materials for making heating boilers

Dijkstra, Anton (2014) Optimizing the material flow at Bosch : supplying the Deventer plant with materials for making heating boilers.

This is the latest version of this item.

[img] PDF
1MB
Abstract:This thesis describes the case of supplying the production process of one of the leading manufacturers of heating boilers in the Netherlands. The materials for the heating boilers are provided by multiple suppliers. These wholesalers supply the manufacturer by truck, which causes a large number of trucks delivering materials to the factory. These trucks cannot arrive at the same time, due to the limited capacity at the factory to unload the trucks. This means that the arrival times of all the trucks have to be adjusted to each other. At the same time, it has to be guaranteed that the production does not get to a standstill, due to the fact that the materials for production are not present at the time they are needed. To prevent this, coordination is needed between the arrival times of the trucks and the composition of the corresponding orders. In this thesis a model is developed which coordinates the determination of the arrival times of the trucks and the composition of the orders.
Item Type:Essay (Master)
Clients:
Bosch, Deventer, Netherlands
Faculty:EEMCS: Electrical Engineering, Mathematics and Computer Science
Subject:31 mathematics
Programme:Applied Mathematics MSc (60348)
Link to this item:https://purl.utwente.nl/essays/66585
Export this item as:BibTeX
EndNote
HTML Citation
Reference Manager

 

Repository Staff Only: item control page