University of Twente Student Theses

Login

Reducing production lead time at Zodiac Galleys Europe

Merrienboer, I.A.A.F. van (2016) Reducing production lead time at Zodiac Galleys Europe.

[img] PDF
3MB
Abstract:In this thesis we have researched how the production lead time can be reduced at Zodiac Galleys Europe. We have selected the bottleneck process, in this case Final assembly. The root cause of the too long lead time at Final assembly is that the process is not standardised. To reduce the lead time we give a mathematical problem and a heuristic to sequence the activities optimal.
Item Type:Essay (Master)
Clients:
Zodiac Galleys Europe, Plzen, Czech Republic
Faculty:BMS: Behavioural, Management and Social Sciences
Subject:58 process technology
Programme:Industrial Engineering and Management MSc (60029)
Link to this item:https://purl.utwente.nl/essays/69480
Export this item as:BibTeX
EndNote
HTML Citation
Reference Manager

 

Repository Staff Only: item control page