Internal delivery planning of materials at the tile plant of Struyk Verwo Infra
Fontijn, Sven (2016) Internal delivery planning of materials at the tile plant of Struyk Verwo Infra.
PDF
2MB |
Abstract: | This research was performed at the tile manufacturing plant of Struyk Verwo Infra in Dordrecht. The plant wants to decrease the Overall Equipment Effectiveness (OEE) by eliminating several causes for downtime of the production machines. This research focuses on minimising the waiting for material at the machine by implementing an improved planning algorithm. Using an MILP approach we present a planning algorithm that can almost eliminate all waiting time caused by poor planning. |
Item Type: | Essay (Master) |
Clients: | Struyk Verwo Infra B.V., Dordrecht, The Netherlands |
Faculty: | BMS: Behavioural, Management and Social Sciences |
Subject: | 30 exact sciences in general, 31 mathematics, 50 technical science in general, 55 traffic technology, transport technology, 83 economics |
Programme: | Industrial Engineering and Management MSc (60029) |
Link to this item: | https://purl.utwente.nl/essays/70309 |
Export this item as: | BibTeX EndNote HTML Citation Reference Manager |
Repository Staff Only: item control page