Internal delivery planning of materials at the tile plant of Struyk Verwo Infra

Fontijn, Sven (2016) Internal delivery planning of materials at the tile plant of Struyk Verwo Infra.

[img] PDF
2MB
Abstract:This research was performed at the tile manufacturing plant of Struyk Verwo Infra in Dordrecht. The plant wants to decrease the Overall Equipment Effectiveness (OEE) by eliminating several causes for downtime of the production machines. This research focuses on minimising the waiting for material at the machine by implementing an improved planning algorithm. Using an MILP approach we present a planning algorithm that can almost eliminate all waiting time caused by poor planning.
Item Type:Essay (Master)
Clients:
Struyk Verwo Infra B.V., Dordrecht, The Netherlands
Faculty:BMS: Behavioural, Management and Social Sciences
Subject:30 exact sciences in general, 31 mathematics, 50 technical science in general, 55 traffic technology, transport technology, 83 economics
Programme:Industrial Engineering and Management MSc (60029)
Link to this item:https://purl.utwente.nl/essays/70309
Export this item as:BibTeX
EndNote
HTML Citation
Reference Manager

 

Repository Staff Only: item control page