University of Twente Student Theses

Login

Optimisation of patient blueprint schedules with downstream departments and uncertain care pathways

Mesman, BSc S.P.M. (2019) Optimisation of patient blueprint schedules with downstream departments and uncertain care pathways.

[img] PDF
3MB
Abstract:The study is performed for the outpatient clinic of the Sint Maartenskliniek. The blueprint schedule dictates the consultation type that can be scheduled at a certain time. An MILP model optimises the sequence and starting time of consultations to match expected minutes of workload at downstream departments with the desired amount. The model allows management of patient flows and improves coordination between the outpatient clinic and downstream departments.
Item Type:Essay (Master)
Faculty:BMS: Behavioural, Management and Social Sciences
Subject:30 exact sciences in general, 31 mathematics, 50 technical science in general, 85 business administration, organizational science
Programme:Industrial Engineering and Management MSc (60029)
Link to this item:https://purl.utwente.nl/essays/78882
Export this item as:BibTeX
EndNote
HTML Citation
Reference Manager

 

Repository Staff Only: item control page