Dongen, J.A. van (2020) Reducing the throughput time at machine-builder X.
PDF
1MB |
Abstract: | The throughput time of the machines built by Machine-builder X needs to be decreased, where this is a demand from customers of Machine-builder X. Some of the materials (purchasing decisions) that are required for building the machine have long lead times, extending the throughput time. With the design of a solution method, a better approach for these purchasing decisions is identified and can be recommended to reach a throughput time of four months. |
Item Type: | Essay (Bachelor) |
Faculty: | BMS: Behavioural, Management and Social Sciences |
Subject: | 58 process technology, 85 business administration, organizational science |
Programme: | Industrial Engineering and Management BSc (56994) |
Link to this item: | https://purl.utwente.nl/essays/82141 |
Export this item as: | BibTeX EndNote HTML Citation Reference Manager |
Repository Staff Only: item control page