University of Twente Student Theses

Login

Optimising the ATQP-process at Company X

Eidhof, M.S. (2020) Optimising the ATQP-process at Company X.

[img] PDF
2MB
Abstract:The Alternative Training and Qualification Programme (ATQP) is a method of training pilots that allows Company X to deviate from the traditional method of training pilots. According to Company X, the productivity of the ATQP-process is low. It was determined that this lack of productivity has multiple causes. However, the core problem of this low productivity is the limited usability of training data. To solve this core problem, the following research question was formulated: ‘How can Company X improve the use of training data within the ATQP-process, in order to increase productivity?’ The goal of this research is to find a method to improve the productivity of the ATQP-process by addressing the core problem. This is done by formulating a conceptual design of an information system, in which the content, structure and presentation requirements of the data are formulated. This conceptual design can inform the development of a solution that can then be implemented by Company X.
Item Type:Essay (Bachelor)
Faculty:BMS: Behavioural, Management and Social Sciences
Subject:54 computer science, 85 business administration, organizational science
Programme:Industrial Engineering and Management BSc (56994)
Link to this item:https://purl.utwente.nl/essays/82566
Export this item as:BibTeX
EndNote
HTML Citation
Reference Manager

 

Repository Staff Only: item control page