University of Twente Student Theses
Work Breakdown Structure as a method for planning and control at Nijhuis Bouw
Zuidema, Dennis (2022) Work Breakdown Structure as a method for planning and control at Nijhuis Bouw.
PDF
2MB |
Abstract: | The Trento Construction department of Nijhuis Bouw is in need of a suitable method for planning and control of construction projects. This method should support automatic schedule generation and should also enable accurate project monitoring. After a selection process for methods proposed in literature, the work breakdown structure method has been selected as a suitable method for Nijhuis Bouw. This method has been further investigated and research has been done on how this method should be shaped to achieve automatic schedule generation and project monitoring. |
Item Type: | Essay (Bachelor) |
Clients: | Nijhuis Bouw B.V |
Faculty: | BMS: Behavioural, Management and Social Sciences |
Subject: | 58 process technology, 85 business administration, organizational science |
Programme: | Industrial Engineering and Management BSc (56994) |
Link to this item: | https://purl.utwente.nl/essays/89649 |
Export this item as: | BibTeX EndNote HTML Citation Reference Manager |
Repository Staff Only: item control page