Optimization of the assembly scheduling at Royal Terberg Group : Solving a Multi-Objective Flow Shop Scheduling Problem with Subsidiary-Specific Restrictions

Author(s): Hampsink, R.J.W. (2023)

Abstract:
The Royal Terberg Group assembles special vehicles and vehicle systems in subsidiaries all over the world. The planners have difficulties with creating a schedule that considers the variations, uncertainties, and restrictions that are present at the subsidiaries. The research focuses on modeling the present flow shop scheduling problem and presents solution approach configurations to solve the specific problem.

Document(s):

Hampsink_MA_BMS.pdf