University of Twente Student Theses

Login

Optimization of the assembly scheduling at Royal Terberg Group : Solving a Multi-Objective Flow Shop Scheduling Problem with Subsidiary-Specific Restrictions

Hampsink, R.J.W. (2023) Optimization of the assembly scheduling at Royal Terberg Group : Solving a Multi-Objective Flow Shop Scheduling Problem with Subsidiary-Specific Restrictions.

[img] PDF
3MB
Abstract:The Royal Terberg Group assembles special vehicles and vehicle systems in subsidiaries all over the world. The planners have difficulties with creating a schedule that considers the variations, uncertainties, and restrictions that are present at the subsidiaries. The research focuses on modeling the present flow shop scheduling problem and presents solution approach configurations to solve the specific problem.
Item Type:Essay (Master)
Clients:
Royal Terberg Group, IJsselstein, The Netherlands
Faculty:BMS: Behavioural, Management and Social Sciences
Subject:01 general works
Programme:Industrial Engineering and Management MSc (60029)
Link to this item:https://purl.utwente.nl/essays/97505
Export this item as:BibTeX
EndNote
HTML Citation
Reference Manager

 

Repository Staff Only: item control page