University of Twente Student Theses

Login

A uniform process for the implementation of Predictive Maintenance at BAM

Leeuwen, M.D. van (2024) A uniform process for the implementation of Predictive Maintenance at BAM.

[img] PDF
7MB
Abstract:The main objective of this research was to develop a uniform process for the implementation of predictive maintenance. This research resulted in a process consisting of ten phases with the focus on static and dynamic asset data to derive maintenance actions. Furthermore, this research resulted in a guideline to ease the implementation of predictive maintenance. Included in the research is a case study that explains how failure mechanisms can be identified and how based on these failure mechanisms data collection methods can be determined. The implementation of predictive maintenance results in necessary adjustments to an organization. In this research is explained how an organization can prepare for the implementation of predictive maintenance.
Item Type:Essay (Master)
Clients:
BAM, Schiphol, Netherlands
Faculty:ET: Engineering Technology
Subject:56 civil engineering
Programme:Construction Management and Engineering MSc (60337)
Link to this item:https://purl.utwente.nl/essays/98219
Export this item as:BibTeX
EndNote
HTML Citation
Reference Manager

 

Repository Staff Only: item control page