Production lead times analysis at Vernay

Author(s): Sanz González, Ernesto Luis (2021)

Abstract:
Vernay Oldenzaal products have a lot of fluctuation on output, leading to late-deliveries and unpredictability. Then, an investigation is carried to find the standard lead times for the fourty-six 'A' type products, as the main bottlenecks and problematic operations, in order to increase the efficiency and stability of lead times.

Document(s):

SanzGonzalez_BA_BMS.pdf