Improving the flow of production materials at company X

Author(s): Laak, T. ter (2021)

Abstract:
Company X faces problems with damaged production materials during the set-up of a batch. The goal of this research is to prevent that those damaged production materials end up at the production machines during the set-up.

Document(s):

TerLaak_BA_BMS.pdf